CASE STUDIES

 December 2015 – Case Study 2 – WA – “Moisture is the Key” Case Study 2 has produced some outstanding results at harvest 2015. This case study did a comparison of the inverted T Boot versus a narrow hoe, both installed on the Moisture Manager Bar. Initially we saw better germination rates and at mid season we were … Continue reading CASE STUDIES